Location : Telok Melano & Marudi
Sarawak Project : KKLW & Sarawak Energy Value (RM 4.3 Million)
Client : Shorefield Sdn Bhd
Project Description:
IPST currently doing the rectification works for the exiting system. This project under KKLW fund is purposely to supply an electricity to the rural village in Sarawak. The system has already operation with their old system almost 2 years.
However, due to unreliability factor the system technology, it was to Malfunction. IPST scope of works it to design, supply & install a new system, testing and commissioning.
100kWp SARES Project
This project just started and IPST joinly work with SSB to perform design and EPCC for the following sites:
1. Long Ukok, Marudi (40kWp)
2. Long Patan, Marudi (60kWp)